Position : Home > Products > Rock drilling rig > Seprated DTH drilling rig

MWGF150 Multifunctional Crawler Photovoltaic Drilling Rig

Brand Name: D miningwell
Certification: CE, ISO
Minimum Order Quantity: 1 set
Packaging Details: 20FR/Bulk Carrier
Delivery Time: 30-45 days
Payment Terms: L/C, T/T, Western Union

MWGF150 multi-functional crawler drilling rig is a multi-purpose drilling rig integrating photovoltaic piling, foundation piling, blasting hole drilling, and down-the-hole drilling.
Share:
Product Description
  The drilling rig is equipped with Yuchai 75KW turbocharged diesel engine, and adopts new hydraulic technology with low air consumption. The rotary gearbox adopts dual motors and high-torque gearbox, which is convenient to move and compact structure. At the same time, the sliding frame has the function of expansion and contraction compensation. When drilling, the sliding frame supports the ground, and the drilling performance is stable. The diameter of photovoltaic piling can reach 150mm-400mm, and the diameter of DTH hammer construction can reach 100mm-350mm. The rig adopts a high-torque motor. The drilling rig has the characteristics of flexible maneuverability, strong climbing ability, suitable for rough site operations, convenient perforation and displacement, high drilling efficiency, easy maintenance and high reliability. It is an ideal multi-purpose drilling rig for photovoltaic piling, mining, road, water conservancy, power station and other construction facilities.
Show details
Overview of solar drilling rig
Rotary Head
Engine and Fuel Tank
Technical Paraments
Technical Paraments MWGF150
Total Weight 5.01 T
Outer Dimension 5.2*2.0*2.55m
Drilling Depth 80m
Walking Speed 3km/h
One-time Feed Length 3m
Maximum Torque 3800/5500N.m
Rotary Speed (High Speed) 85r/min
Rotary Speed (Low Speed) 40r/m
Chassis Ground Clearance 33cm

Application
Related cases
Nov 12, 2025

DMiningwell 115 High-Pressure Down-the-Hole Drill: A Pioneer in Efficiency for Hard Rock Construction in Quarries

In the field of mining engineering, the performance of drilling equipment directly affects construction efficiency and project costs. Especially in the complex hard rock environment of quarries, a down-the-hole drill that combines high efficiency, wear resistance, and adaptability to various rock types is undoubtedly a core tool for improving productivity. The DMiningwell 115 high-pressure down-the-hole drill, with its excellent drilling capability and alloy wear resistance, delivered an impressive performance in a recent test at a quarry—after 209 meters of normal alloy wear, it could still drill approximately 30 meters, fully demonstrating its core strength in hard rock construction.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.