Position : Home > Products > Water well drilling rig > Mud-pump

Mud pump BW 850

BW850 Electric High Pressure Piston Duplex Mud Pump is horizontal double cylinder reciprocating double action piston pump.
Share:
Product Introduction
BW series mud pump is widely used in mining, drilling, coal, railway, highway, water conservancy and hydropower, bridges, high-rise buildings, foundation reinforcement works.
1. BW850 Electric High Pressure Piston Duplex Mud Pump adopted advanced product design, reasonable structure, high pressure, flow, multi-file variable, energy saving, light volume, efficiency, plant life, safe operation, easy maintenance.
2. The power has electric driving and diesel driving, customer can choose before ordering. It can also use hydraulic motor to drive.
3. Compact structure, light weight, small volume, beautiful appearance, is driven by a hydraulic motor, electric power or diesel engine.
4. BW series slurry pump is horizontal triplex grout pump with high stability and high pressure.
5. Mud pump has gear shift to adjust the flow, large output capacity, simple operation.
6. High quality pump parts, less wearing parts, long service life, low construction cost.
7. Electric High Pressure Piston Duplex Mud Pump has fast suction-discharge speed, high pump efficiency.
8. Mud pump has less noise and dust, environmental operation.
 
Show details
Technical data
Technical Parameters
Type BW850-2
Horizontal double cylinder reciprocating
double acting piston pump
Cylinder dia.(mm) 150
Stroke(mm) 180
Pump Speed(times/min) 82/58
Flow(L/min) 850/600
Pressure(Mpa) 2.0 /3.0
Power(Kw) 37
Dimension(mm) 2000*1030*1400
Weight(kg) 1500
Related cases
Oct 09, 2024

"Zhejiang Miningwell Supply Chain Management Co., Ltd. shines at Hangzhou Machinery Exhibition"

A machinery exhibition with the theme of "Machinery and Technology" was held in Hangzhou, Zhejiang from September 25 to 27, 2024, and Zhejiang Mining Supply Chain Management Co., Ltd. became the highlight of the exhibition. Its booth at the exhibition attracted a lot of attention. The mechanical products displayed were integrated with scientific and technological achievements. From drilling equipment to power transmission devices, the company's technical strength was fully demonstrated. The professional team explained the products in detail. In addition, the company also communicates and interacts with all parties through various forms to enhance its visibility and lay the foundation for cooperation. This exhibition demonstrates its strength and delivers innovative development signals, which is expected to promote industry progress.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.