Position : Home > Products > Rock drilling rig > Integrated DTH drilling rig

Integrated DTH drilling rig SWDB165C

Brand Name: D miningwell
Minimum Order Quantity: 1 set
Packaging Details: 40HQ-20GP
Delivery Time: 15-20 days
Payment Terms: L/C, T/T, Western Union

The SWDB series open-air DTH drill carriage is equipped with three 8.5-10m drill rods, which reduces rod changing operations and improves work efficiency. The powerful rotary head allows it to maintain high efficiency even when working with large diameters. The modular air compressor facilitates maintenance. At the same time, the machine can be customized into diesel-electric integrated power to meet different usage scenarios.
Share:
Product Introduction
The SWDB series open-air DTH drill carriage is equipped with three 8.5-10m drill rods, which reduces rod changing operations and improves work efficiency. The powerful rotary head allows it to maintain high efficiency even when working with large diameters. The modular air compressor facilitates maintenance. At the same time, the machine can be customized into diesel-electric integrated power to meet different usage scenarios.
Show details
Technical data
Technical Parameters SWDB138 SWDB165A SWDB200A SWDB250
Working parameters
Hole diameter(mm) 138-165 138-180 180-255 230-270
Hole depth(m) 25 25 30 30
Rod diameter(mm) 102/114 114 146 146
Rod length(m) 8.5m*3 8.5m*3 10m*3 10m*3
Hammer size 5", 6" 5", 6" 6", 8" 8", 9"
Dust collector Dry type(Standard) / Wet type(Optional)
AIR COMPRESSOR
Working pressure(Bar) 2 2 2.07 20.7
Air displacement(m3/min) 18.6 24.1 30.3 34
Power(kW/rpm) 194/1800 262.5/1900 328/1800 336/1850
ENGINE
Model Cummins QSB4.5 Cummins QSB4.5 Cummins QSB4.5 Cummins QSB4.5
Power(kW/rpm) 97/2200 97/2200 97/2200 97/2200
Fuel tank capacity(L) 1200 1200 1200 1200
FEED
Feed beam length(mm) 11500 11500 13200 13200
Feed Stroke(mm) 9000 9000 10500 10500
Feed extension(mm) 1800 1800 1800 1800
Feed rate.Max(m/s) 0.8 0.8 0.8 0.8
Feed force.Max(kN) 60 60 75 75
Forward tilting angle(°) 90 90 90 90
TRAVEL CAPACITY
Travel speed(km/h) 3.2 3.2 2.8 2.8
Traction force,MaxkN) 125 125 175 175
Gradeability(°) 25 25 25 25
Ground clearance(mm) 480 480 480 480
ROTARY
Rotary speed(rpm) 105 105 50 50
Rotary torque(Nm) 4500 5500 6000 6620
DIAMENSION
Gross weight(T) 22 28 30 32
L*W*H Working(mm) 7100*4180*12000 7500*4650*12000 7500*4680*13800 7500*4680*13900
L*W*H Transportation(mm) 12000*3200*3200 12000*3350*3400 13800*3350*3400 13900*3350*3450
Related cases
Nov 28, 2024

Custom Crawler Water Well Drilling Rig IMM500

The IMM500 Custom Crawler Water Well Drilling Rig is a standout in the drilling equipment market. Engineered to meet diverse client requirements, its performance capabilities are second to none. With a powerful drilling mechanism, it ensures efficient and precise operations, whether for shallow or deep water well drilling tasks. What sets it apart further is the option for customization. Clients can choose the color that aligns with their branding or personal preferences, making the rig not just a functional tool but also a visual representation of their identity. The prominent logo placement, carefully integrated as per request, adds a unique touch of professionalism. And of course, the IMM500 model itself is renowned for its reliability and durability, being designed with top-notch engineering standards. Whether you're in the agricultural, industrial, or domestic water supply sector, this custom rig offers the perfect blend of aesthetics and functionality, ensuring your drilling projects are executed with excellence and style.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.